(1)
Wang, W.; Khatibi, A.; Tham, J. Empirical Correlation and Upgrading Path Between Construction Quality Management and Organizational Performance: Strategic Analysis Based on BIM IoT and Performance Linkage. IJGEM 2025, 8 (3), 1-15. https://doi.org/10.62051/ijgem.v8n3.01.